November 6, 2020 10:46 AM

CONSTRUCTION NOTIFICATION Week of NOVEMBER 09, 2020

PAVING
Monday October 05 paving on the Tower Hill area starting on:

o Fulton St. from East Haverhill to Prospect St
o Lebanon St. from Hampshire St. to Lawrence St.
o Cross St from Broadway St to Manchester St.
o Pleasant St. from Woodland St to Manchester St.
o Webster Court from Prospect Street to end

WATER WORK
South Lawrence Water Main Design (DWSRF 4594, City Contract 6980)

Furber Street
• Replace remaining water services and connect to new main

South Lawrence Water Main Design (DWSRF 4594, City Contract 6979)

• Fallon Street at Belknap Street intersection replacement - Night work/shutdowns required; Planned for night of 11/9/2020
• Coolidge Street at Belknap Street intersection replacement - Night work/shutdowns required; Planned for night of 11/10/2020
• Andover Street full width paving and casting repairs (11/9-10/2020 – South Broadway to about Gardner Terrace)


South Lawrence Valve Replacement (DWSRF 4562, City Contract 6981) – Night work/shutdowns required

Replace V1020 – South Broadway at Sylvester Street - Night work/shutdowns required; Planned for night of 11/8/2020


Planned work the week of November 15, 2020

South Lawrence Water Main Design (DWSRF 4594, City Contract 6980)

Furber Street
• Replace remaining water services and connect to new main


Remove temporary bypass in Everett Street and Furber Street

SEWER WORK

Cutting laterals on
• Hampshire Street
• Irene Street
• Tudor Avenue
• Smith Street
• Winter Street
• Gale Street
• Fordham Road
• School Street
CCTV on
• Oxford St
• Margin St